<p> <strong>SCEGC Equipment Installation Group New Energy Co., Ltd</strong> </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142542_65332.png" alt="" width="30" height="30" title="" align="" />&nbsp;029-83663581&nbsp; </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142011_12337.png" alt="" width="30" height="30" title="" align="" />&nbsp; sjxny@sxnec.com&nbsp; </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142527_75385.png" alt="" width="30" height="30" title="" align="" />&nbsp;17F, Building 17, Fengcheng 9th road, Weiyang Dist., Xi 'an City, 710018 China </p> <p> <br /> </p> <p> <span></span> </p>

News Center Current Position:HOME > News Center

Construction progress of Luneng Yijun 49.5MWp PV Power Generation Project up to November, 30th
author:admin viewed:291 time:2018-12-05

     Luneng·Yijun 49.5MWp PV Power Generation Project was invested by Shaanxi Luneng Yijun New Energy Co.,Ltd and contracted to build by SCEGC Group New Energy Co.,Ltd.

     This project is located in Bazhangyuan Village, Yaosheng Town, Yijun County, Tongchuan City, Shaanxi Province. 

     The total installed capacity of the project is 49.5MW. As of November 30, 2018, the project has basically completed construction and grid-connected work, and is currently undergoing final commissioning. The detailed completion progress is as follows:


  • 1. The shortage of civil power in the booster station is being eliminated;
  • 2. The pouring construction of the roof of the booster warehouse is completed, and the appearance of the flag platform has been completed (not constructed this year due to weather);
  • 3. The disputed work tool problem is completed;
  • 4. The station of the booster station is processed and the station is intuitively completed;
  • 5. The test of the Institute of Electric Power is completed;
  • 6. Handling individual faulty inverters;
  • 9. The photovoltaic area has been completed by weeding and turning over, waiting for acceptance;
  • 10. The photovoltaic zone fence installation is completed;
  • 11. The 16 areas of the rod rust removal have been completed;
  • 12. The standardization construction of the national network in the booster station is completed.