Welcome to visit SCEGC Equipment Installation Group New Energy Co., Ltd Chinese | English
Projects Show
<p> <strong>SCEGC Equipment Installation Group New Energy Co., Ltd</strong> </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142542_65332.png" alt="" width="30" height="30" title="" align="" />&nbsp;029-83663581&nbsp; </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142011_12337.png" alt="" width="30" height="30" title="" align="" />&nbsp; sjxny@sxnec.com&nbsp; </p> <p> <img src="http://es.sxnec.com/upload/image/20181018/20181018142527_75385.png" alt="" width="30" height="30" title="" align="" />&nbsp;17F, Building 17, Fengcheng 9th road, Weiyang Dist., Xi 'an City, 710018 China </p> <p> <br /> </p> <p> <span></span> </p>

Projects Show Current Position:HOME > Projects Show


 
<p style="text-align:justify;"> <span style="font-family:&quot;font-size:14px;">The project is located in Fangta Villa, Jia County, Yulin City of Shaanxi Province.&nbsp;</span> </p> <p style="text-align:justify;"> <span style="font-family:&quot;font-size:14px;">A total of 25 wind turbines with a capacity of 2,000 kW are installed, with a total installed capacity of 50 MW. The total investment of the project is 436.339 million yuan, of which the environmental protection investment is 3.892 million yuan, accounting for 0.913% of the total investment of the project.</span> </p>

SCEGC Equipment Installation Group New Energy Co., LtdTel: 029-83663581Email:sjxny@sxnec.com

Address: No.79, Fengcheng 9th Road, Xi'an, China陕ICP备18010279号-1

0.153805s